Bad weather, holidays etc have delayed some of the works, so running about 1 month late from predicted stage, but things are going at pace now.
All the glazing is in now (a certain shade of grey :)). First fix electric and gas is all nearly done, flooring is next before plastering. It’s taken longer than expected to get to this stage, and we are already over the original build quote from pre-covid, but for me the results are worth every single penny. I’m really missing the garden now.
I wasn’t sure just how the front glazing was going to look, but quite surprised at how reflective the glass is from the outside and the clear view from the inside. The pace of work in the last few weeks have been amazing, hope it carries on at this rate, and who knows, maybe we’ll be in by Easter :).